Projects
- Assumption Cathedral
- Moncton, NB
2002
- About the project
- SafLock System scaffold was erected up and around Assumption Cathedral to replace copper spire and to access stone work to repaint and/or repair. Scaffold was erected on structural steel beams at the 60 foot elevation. Overhead protection was erected at the front entrance to allow the cathedral to remain in use.
- Products used
- SafLock System Scaffold














